The Roof has been completely renewed thanks to a Government Grant.  Best use of the scaffolding was also made to replace the chimney and return it to its original Victorian design.  Stonework around the exterior Apse and the Tower was also carried out to renew and make safe.   Inside the Reredos is now lit and the counterweighted candelabra have been serviced after 130 years.  The rewiring and new lighting is complete.  This allows us to change the church light settings to match the occasion.

In the last eighteen months a project to renovate the organ has been completed.

The next major project is the renovation of the Churchyard wall - grade 2 listed in its own right.  It is unique in its clay appertures and flint capping.  The wall is undergoing surveys and architectural planning before permissions and grants are sought.   The Lych-gate is due to be renovated in the Summer 2025.

The old church area which includes the Village War Memorial, is being refurbished. The old decayed boundary wall on the West side has been refurbished.  The old headstones have been placed along the bank supporting the wall on the South West corner; these were found when the War Memorial was being commissioned.  Extra car parking spaces are being developed on the East side.  The bank between Church Lane and the site of the former church is being replanting by the local residents.

You can only really appreciate the beauty of this place and why it needs such upkeep if you come and visit.  The image at the start of this section is taken from the East end of the site of the former church - the car park surrounds the former church mound and War Memorial.